|
RECENT PREDICTIONS |
|
| MONTH 09/97 08/97 07/97 06/97 05/97 04/97 03/97 02/97 01/97 12/96 11/96 10/96 09/96 08/96 07/96 06/96 05/96 04/96 03/96 02/96 01/96 TOTAL: |
PROBABILITY 80% (16/20) 75% (15/20) 75% (15/20) 75% (15/20) 70% (14/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 75% (15/20) 75% (15/20) 80% (16/20) 80% (16/20) 79.29% строительство под ключ |
PREDICTED 4.0 5.5 7.0 9.5 5.0 4.5 5.0 5.0 6.0 5.0 4.5 5.5 4.0 5.5 5.0 4.5 4.0 6.0 4.0 6.5 4.5 110.5 |
HITS 3.0 2.5 5.5 7.5 3.0 1.5 3.5 3.0 4.5 3.0 3.5 4.5 1.5 3.0 3.0 3.0 3.0 4.0 3.0 5.5 2.0 73.0 |
PERCENTAGE 94% 57% 105% 105% 86% 42% 82% 75% 94% 75% 97% 102% 47% 64% 71% 83% 94% 89% 100% 106% 56% 83% |
| MONTH 09/97 08/97 07/97 06/97 05/97 04/97 03/97 02/97 01/97 12/96 11/96 10/96 09/96 08/96 07/96 06/96 05/96 04/96 03/96 02/96 01/96 TOTAL: |
PROBABILITY 80% (16/20) 75% (15/20) 75% (15/20) 75% (15/20) 70% (14/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 75% (15/20) 75% (15/20) 80% (16/20) 80% (16/20) Ibistic Faktura behandling |
PREDICTED 1.0 1.0 1.0 1.0 1.0 1.0 2.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 2.0 1.0 1.0 3.0 1.0 1.0 1.0 25.0 |
HITS 0.0 0.0 1.0 0.0 0.0 0.0 2.0 0.0 0.0 0.5 0.5 0.5 0.0 0.0 2.0 0.0 1.0 3.0 1.0 0.0 0.0 11.5 |
PERCENTAGE 00% 00% 133% 00% 00% 00% 118% 00% 00% 63% 63% 63% 00% 00% 118% 00% 125% 133% 133% 00% 00% 58% |
| MONTH 09/97 08/97 07/97 06/97 05/97 04/97 03/97 02/97 01/97 12/96 11/96 10/96 09/96 08/96 07/96 06/96 05/96 04/96 03/96 02/96 01/96 TOTAL: |
PROBABILITY 80% (16/20) 75% (15/20) 75% (15/20) 75% (15/20) 70% (14/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 75% (15/20) 75% (15/20) 80% (16/20) 80% (16/20) Professional mexico extended stay department |
PREDICTED 1.0 2.0 4.0 3.5 2.0 1.5 1.0 2.0 3.0 2.0 1.0 2.5 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.5 1.5 35.5 |
HITS 1.0 2.0 4.0 3.5 2.0 0.5 1.0 2.0 3.0 2.0 1.0 2.5 1.0 0.0 0.5 1.0 0.5 0.0 1.0 1.5 1.5 31.5 |
PERCENTAGE 125% 133% 133% 133% 143% 42% 118% 125% 125% 125% 125% 125% 125% 00% 59% 125% 63% 00% 133% 125% 125% 112% |
| MONTH 09/97 08/97 07/97 06/97 05/97 04/97 03/97 02/97 01/97 12/96 11/96 10/96 09/96 08/96 07/96 06/96 05/96 04/96 03/96 02/96 01/96 TOTAL: |
PROBABILITY 80% (16/20) 75% (15/20) 75% (15/20) 75% (15/20) 70% (14/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 75% (15/20) 75% (15/20) 80% (16/20) 80% (16/20) |
PREDICTED 1.0 1.0 1.0 4.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 24.0 |
HITS 1.0 0.0 0.0 4.0 0.0 1.0 0.0 1.0 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 1.0 0.0 0.5 1.0 0.5 14.0 |
PERCENTAGE 125% 00% 00% 133% 00% 125% 00% 125% 63% 63% 63% 63% 63% 59% 59% 63% 125% 00% 67% 125% 63% 74% |
|
MONTH 09/97 08/97 07/97 06/97 05/97 04/97 03/97 02/97 01/97 12/96 11/96 10/96 09/96 08/96 07/96 06/96 05/96 04/96 03/96 02/96 01/96 TOTAL: |
PROBABILITY 80% (16/20) 75% (15/20) 75% (15/20) 75% (15/20) 70% (14/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 80% (16/20) 85% (17/20) 85% (17/20) 80% (16/20) 80% (16/20) 75% (15/20) 75% (15/20) 80% (16/20) 80% (16/20) |
PREDICTED 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.5 1.0 1.0 2.5 1.0 1.5 1.0 1.0 1.0 3.0 1.0 25.5 |
HITS 1.0 0.5 0.5 0.0 1.0 0.0 0.5 0.0 1.0 0.0 1.5 1.0 0.0 2.5 0.0 1.5 0.5 1.0 0.5 3.0 0.0 16.0 |
PERCENTAGE 125% 63% 67% 00% 143% 00% 59% 00% 125% 00% 125% 125% 00% 118% 00% 125% 63% 133% 67% 125% 00% 79% |
|
Earthquakes of .1M within windows score .5 Hits.
Earthquakes of proper magnitude which fall within hours + or - score .5 Hits.
Earthquakes of 3+M which are within the window and are the greatest within
the month score .5 Hits.
Earthquakes exceeding the minimum magnitude but just outside the region score
.5 Hits. Multiple earthquakes within a window score 1 Hit and register 1 prediction, or .5 Hits and .5 predictions. FORMULA: (HITS / PREDICT) / PROBABILITY SITEMASTER'S NOTE: Scoring of close calls was done by me, in a way that I deemed as fair. If you have any difficulty with the method, please email me, Will Fletcher with your concerns. Thank you. |